| 
|  |  
| 采购内容 | Buy Bolts, Nuts  |  
| 详细内容 | Would like to inform you that CEGCO CENTRAL ELECTRICITY GENERATING COMPANY of Jordan announced for tender no 4/2009 for supply of Stainless steel bolts, nuts & studs Please find attached tender specs, qty & drawing of each item
 Those materila will be used for 66MW STEAM TURBINE BOLTS, NUTS AND STUDS, in Hussein thermal power station
 Closing date on 2/3/2009
 Prices: Should be on the basis of (CFR) AQABA Jordan PORT
 - Delivery period to be stated in your offer
 - Validity: Prices should be valid for 90 days from 2/ 3/2009
 - Payment: Will be 100% by irrevocable & confirmed L/C at sight
 - Quotation with technical specs, drawings should be sent by email, origin offer with technical specs, drawings, 2 copy of manufacturer catalogue to be sent by courier to our address.
 
 Country:Jordan
 /手机/MSN
 
 |  
| 联系方式 | Co:Baouninc1 Engeneering Add:28 Jamal Al Din Al Afghani Street, Amman
 Tel:962-6-4628002
 Fax:962-6-4628002
 Email:baouninc1@wanadoo.jo
 Mobile:962-796103657
 MSN:aalkam@hotmail.com
 
 LinkMan:Mr. Ahmad Alkam(Tenders Dept.)
 |  
|  |  |  |  |