|
采购内容 |
Buy Hydropower Equipment |
详细内容 |
Dear Sirs and Ladies, First I want to inform you that our companies are the winners on the tender for concession for Small Hydro Power Plants in Macedonia. In this moment we have to build 2 power stations. Our future plans is to take concessions for more plants in the next tender. Please give me your best offer for equipment for this Small Hydro Power Plants with following technical data: 1. Head gross = 275m Head net = 246m Flue max = 1,70 m3/s Flue min = 0,12 m3/s Generator Power = 3300KW IT IS BETTER TO BE TWO SYSTEMS 2200KW + 1100KW. Channel (underground pipe PE 100 F 800 mm PN 4 bars) L=1850m Penstock (aboveground steel pipe F 710 mm PN 30 bars) L=560m 2. Head gross = 48m Flue max = 0,35 m3/s Flue min = 0,05 m3/s Generator Power = 130KW IT IS BETTER TO BE TWO SYSTEMS 45KW + 85KW. Channel (underground pipe PE 100 F 560 mm PN 10 bars) L=950m Offer to be completed with technical data for equipment dimensions and weight, for planning the civil designee. Our team of engineers will decide what is the best solution for our hydropower stations. Best Regards
Country:Macedonia
|
联系方式 |
Co:ELING Add:Ognjan Prica, Skopje 389, Macedonia Tel:389-2-2770500 Fax:389-2-2770504 Email:eling-invest@t-home.mk LinkMan:Ivan Ilievski |
|
| |
|