免费注册 登陆 
主页 >> 最新求购采购信息 Buyingleads >> 计算机与通讯 >> Buy Hydroelectric Generators
采购内容

Buy Hydroelectric Generators

详细内容

We intend to install turbines in 6 stations on a water pipeline with about25km. in length, 800mm. diameter and max. flow of 0.6m3/s, flowing down from ahigh land, the head varies at each location, between 110 to 200m.
Kindlyplease give your budgetary quotation for supply 6 units of water turbinegenerators with max. water flow of 0.6m3/s, max. head of 180m, 13.8kv. 50Hz.

Country:Iran
/网站



联系方式 Co:Water & Power Rosemond
Add:# 1, 4th. flr. Falamak Ave. Shahrak Ghods, Tehran, Iran
Tel:0098-21-88513748
Email:a.solgi@wp-rosemond.com
Website:www.wp-rosemond.com

LinkMan:Mr. A Solgi
   

 

Copyright ? 2008 Todaytex Co.,Ltd All rights reserved.