|
采购内容 |
Buy Gas Turbine |
详细内容 |
We need 5 gas turbine power units per 4 - 4.3MW Power units may be used but new ones are prefered. we are still looking for gas turbine power units with gas separators. We need 5 items at all. Here are main features of them: capacity: 4.3 MW system effectiveness measure of power turbine - 25% capacity of generator clamps - 4.13 MW system effectiveness measure of generator clamps - 24% Degree of increased Pressure in compressor - 7.3 Temperature of gas outside of power turbine - 414'C Gas expense outside the turbine (exhaust) - 29.8 kg/sec Frequency of power unit rotation - 5500 rotations/min Exhaust heat power (if reducing gas temp to 110' C) - 8.3 Gigo calorie Total system effectiveness of electrical unit (electrical + heat)-80.2% We need 5 units with fuel gas separator. Please, contact me as soon as possible
Country:Russian Federation /网站/MSN/Skype
|
联系方式 |
Co:STROYSNAB ZAO Add:1 Neftynaya, Khabarovsk, Far East, Russian Federation Tel:7-4212-416791 Email:ksenia@stroysnab.su, anna@stroysnab.su Website:http://www.stroysnab.su MSN:ksenia@stroysnab.su Skype:ksenia_selivanova
LinkMan:Ms. Nina Glushkova |
|
| |
|